European Green Cities Network (EGCN)
Menu contact

Centralised low temperature heating system with condensing boiler and radiant panels

Extra insulation of the building envelope permitted to reduce the heat demand for space heating. Therefore the solar preheating of the ventilation air in the conservatories reduced the effective heat demand of the building.

The building is served by a low temperature heating plant consisting in a condensing boiler that produces hot water at ≈ 50° C.

The hot water supplies a radiant space heating system in the rooms of all the apartments.

The distribution piping has been designed as shorter as possible in order to have lower distribution loss.

Suppliers of technology:

Condensing boiler: "Carbofuel Ecogas 300".
CARBOFUEL S.p.A.
Via A. Colombo, 110,
I-21055 Gorla Minore (VA)
www.carbofuel.it

Gas burner: "BALTUR tpr ar"
BALTUR S.p.A.
Via Ferrarese, 10
I-44042 Cento (FE)
www.baltur.it

EGCN Secretariat  ●  C/O European Green Cities   Phone: +45 33 22 90 90   ●  e-mail: jf@greencities.eu

Fast bund Members