Individual multifunctional heating plant with condensing gas boiler and integrated ventilation

Two of the building blocks in the Houtvenne project are heated by individual, multifunctional heating plants, which combines heating, subsequent heating of domestic hot water and ventilation. The advantage of such design lies in the waste heat utilisation. The plant uses the waste heat of the boiler for the preheating of the ventilation air.

Illustration of system:

A = returning heating circuit
B = start heating circuit
C = cold water input
D = to hot water tap
E = gas
F = condense disposal
G = returning air
H = air input
J = fresh air
K = disposal waste air + flue gasses

1 = outside air filter
2 = fan for fresh air
3 = fan for disposal of old air
4 = heat recovery 
5 = condense disposal
6 = integrated heat exchanger
for heating and DHW
7 = burning bed
8 = circulation pump
9 = returning air filter
10 = gas input feeding block
11 = valve
12 = collection box

Exhaust air from the kitchen, bathroom and toilets is transferred via the ductwork of the ventilation system to the condensing gas boiler. Part of this air is used for burning the gas, whereas the remainder is transported through the valve to the collection box. The valve controls the air supply for the burning bed in order to ensure optimal burning of the gas. The stale air and the exhaust flue gas goes through the heat exchanger, where it condenses and releases its latent energy. In the heat exchanger fresh air is coming in, heated, and distributed to the dwellings by the ventilation ductwork.


 

Ventilation Block 1 Block 2 Block 3 Total
         
Technique:

Mechanical ventilation with heat recovery

Energy savings:        
Energy consumption (kWh/mē):        
• without heat recovery 79 79 79 79
• with heat recovery 50 50 50 50
Total energy consumption (kWh):        
• without heat recovery 27,729 97,249 48,980 173,958
• with heat recovery 17,550 61,550 31,000 110,100
Savings in naturel gas:        
• Consumption (kWh) 10,179 35,699 17,980 63,858
• Costs (BEF/year) 11,854 41,573 20,938 74,365
         
Investments (BFF):        
• Surplus costs/dwelling 55,000 55,000 55,000 55,000
• Total surplus cost 165,000 660,000 440,000 1.265,000
         
Pay back time (years): 13,9 15,9 21,0 17

General information on the technologies:
Ventilation and heat exchange
Condensing Gas Boilers
EMS


Supplier of Technology:
There have been several suppliers involved in the project, yet there is just one manufacturer of the multifunction heating plant:

J.E. StorkAir
Stork Air is a Dutch company that manufactures ventilation systems and other equipment related to the control of indoor climate.
Postbus 621
B-8000 AP Zwolle
Phone: +32 38-42 96 911
e-mail: sales@jestorkair.nl
www.jestorkair.nl
 


EGCN Secretariat  ●  C/O European Green Cities   Phone: +45 33 22 90 90   ●  e-mail: jf@greencities.eu

Fast bund Members